Heading To Ocean City NJ is a photograph by Tom Gari Gallery-Three-Photography which was uploaded on July 24th, 2014.
Heading To Ocean City NJ
The causeway between Ocean City and Somers Point was built in the 1930s with four lanes and no shoulders. Route 52 was designated 1937 to run from... more
Title
Heading To Ocean City NJ
Artist
Tom Gari Gallery-Three-Photography
Medium
Photograph - Photography
Description
The causeway between Ocean City and Somers Point was built in the 1930s with four lanes and no shoulders. Route 52 was designated 1937 to run from the Somers Point Circle northwest to Route 48 (now U.S. Route 40) and Route 50 in Mays Landing. However, Route 52 was never built to run to Mays Landing. In the 1953 New Jersey state highway renumbering, Route 52 was designated to run from the Ocean City side of the Great Egg Harbor causeway north to U.S. Route 9 in Somers Point.With the creation of the 500-series county routes in New Jersey in 1952, County Route 585 was designated to run along Route 52 between the southern terminus and the Somers Point Circle as part of its route between Route 109 in Lower Township and U.S. Route 30 and Route 157 in Absecon. Eventually, the southern terminus of County Route 585 was truncated to the Somers Point Circle.
Between 2006 and 2012, a new $400 million causeway was built to replace the 1930s bridges over the Great Egg Harbor Bay. The original causeway was in need of replacement due to deteriorating conditions of the bridges, increasing automobile and marine traffic on the Great Egg Harbor Bay, flooding from storms, and a high accident rate due to narrow lanes and a lack of shoulders. The causeway also contained two drawbridges, which led to traffic jams during the summer months. On January 16, 2006, the New Jersey Department of Transportation reduced traffic on the existing bridges from four lanes to two lanes to limit the weight on the old structures. The highway was reopened to four lanes of traffic after guardrail repairs were made on May 17, 2006, with a new speed limit of 35�mph (56�km/h). After years of delays, construction began on the new bridge in September 2006. Crews began the project by clearing a staging area on Garrets Island near the Ocean City side. The northbound bridge was completed in April 2008 and the southbound bridge was completed in April 2009. In May 2012, construction of the causeway was completed, with all four lanes opened to traffic.